MoxyWolf LLC
Resource pack

R3-09 · backs slide 17

R3-09 PR/FAQ internal-use file

Supports slide 17.

Two separate things share a name. The PRFAQ product is on hold. The PR/FAQ method is how we launched STIGViewer’s paid tier, and it stays in use whatever happens to the product.

The method, used on STIGViewer

Date Step
12 Jan 2026 Alec’s sample PR/FAQ for the paid launch
24 Feb 2026 Funnel written in PR/FAQ terms
20 Mar 2026 Acceptance test against the PR/FAQ: 13 defects found in a day
23 Mar 2026 Develop to production
12 Aug 2026 Measurement rebuilt from Stripe; the zero I reported that day turned out to be wrong (R2-05)

The product, on hold

  • Built prfaq.dev in two 8-hour sprints with our plugin stack: “I built this in two 8 hour sprints using our moxywolf plugins: prfaq.dev” (22 Jun 2026).
  • The JTBD collaborators are Mike and Adam Boysen of Practical JTBD.
  • Pull came only through consulting conversations. No consulting revenue appears in email; if any was booked, QuickBooks is the source.
  • Decision, Jun 2026: no further build. Trigger to reopen: a buyer who isn’t a consulting client.

Sources:

  • Method dates: Capstone Facts Reconciled (PRFAQ dogfood); Slack #sams, 20 Mar 2026 (acceptance test thread)
  • Product build: Gmail 1868696017704623008; Capstone Spine Timeline (PRFAQ lane)
  • Reopen trigger: slide 21