R6-01 · backs slide 34
R6-01 Growth drivers
Supports slide 34.
Three things drive growth. None of them is a regulatory date. Each has a number I can track.
| Driver | What it is | Input metric | Where it stands |
|---|---|---|---|
| Partner distribution | Our content inside Strike Graph (357 organisations) and DTA. Resale through Policycode and Sentient (528 reachable accounts: 148 and 380). Their paper, their installed base. | Partner-sourced accounts; content live in partner products | 0 partner-sourced accounts so far (slide 21). Strike Graph embed planned from November 2026; DTA paperwork with lawyers. |
| Agent-native access | API and MCP bundled in the paid tier. The crosswalk as a function call for the agents and GRC platforms buyers already run. | API and MCP keys issued; calls per key | MCP server in beta with SecRed, Marfi and IT Convergence (R2-03). |
| Standing obligations | Phase 1 self-assessment, NIST 800-171 and DFARS 7012 apply whatever happens to Phase 2. | Verified signups from .mil, .gov and contractor domains | 192 signups since 1 May, 112 verified (slide 3). Not yet split by domain. |
CMMC Phase 2, if it comes back, is upside. It isn’t in the base case.
Not yet evidenced: a baseline count of API and MCP keys issued and calls per key. Not yet evidenced: verified signups split by .mil, .gov and contractor domain. Not yet evidenced here: the status of CMMC Phase 2. That belongs to R1-10.
Sources:
- Strike Graph 357 organisations: Capstone Deck v1.2 Build Note, SOM line.
- Policycode 148 and Sentient 380: Founder Operating System, Module 10 (17 Aug 2026), input metric 4.
- DTA status: Capstone Facts Reconciled, 17 Oct 2026.
- MCP beta partners: R2-03 partner bench register.
- Signups 192 / 112 verified: STIGViewer verification records since 1 May 2026, as reported on slide 3.