MoxyWolf LLC
Resource pack

R8-02 · Deck v4.7 6, 7, 8, 10

R8-02 Four bets (1 of 2): assumptions and verdicts

Moved from deck appendix page A02 on 21 Oct 2026 (deck v2.2 → v2.3). Content as it stood on the slide; the source notes follow each part.

Part 1

Bet Riskiest assumption Test and evidence Verdict, date Effect on the next dollar and hour
Assured (Jody’s book, live May 2025) The book is a funnel to classes and coaching Readers bought and praised it; 24 testimonials. Nobody enrolled in a class. Income is the author’s. Redeveloped, Mar 2026 Site rebuilt in-house; classes dropped; book remonetised for Jody. No MoxyWolf hours past the rebuild.
DeepFeedback.ai (from Looplytic, May 2025) Founders will pay for AI customer research Demand real, trust cliff at signup. About $35K lifetime revenue in the JV account; never enough to carry a team. Partners out 13 Jan; wound down 20 Feb 2026 Partners’ time out. Founder’s time to STIGViewer.
PRFAQ (prfaq.dev, Nov 2025) A sales motion exists without consulting Built in two 8-hour sprints (Jun 2026). Pull came only through consulting. The method ran STIGViewer’s own launch. Held, Jun 2026 No further build. Runs as an option; the method stays in use.
STIGViewer / OpenControls (handed over Sep 2025) The user, the buyer and the seller are one person They are three. Practitioner free, compliance lead signs, partner resells. 2 paying through Stripe, 1 invoiced. Anchor, Sep 2025 on The mapping engine, the partner bench, the pricing. Every next dollar and hour.

Source notes:

Old pp.6 and 17. How the fourth bet arrived: Helmut Neher ran STIGViewer for UCF; after Dorian left, DoD and DISA instructed the handover; a GSA team took it first; Michael took the helm 26 Sep 2025 (R1-02, R1-07, R1-11). Failure reasons unchanged from the original.

Part 2

When The bets The founder and team The world
Apr to Jul 2025 Classes start 26 Apr. Assured live May. DeepFeedback built from Looplytic. Meets Phil in class. KingdomKode starts. Steven joins (Aug). Claude 4, Claude Code GA
Oct 2025 to Jan 2026 STIGViewer handover (26 Sep); new site Nov. PRFAQ designed with Mike Boysen. RegGenome JV: pass (10 Dec). Google AI Agents Live + Labs, LA (15 Oct). Eric: venture studio. First plugin. GPT-5. Marketplace public (3 Jan).
Jan to Apr 2026 DeepFeedback partners out 13 Jan; wound down 20 Feb. Assured redeveloped Mar. Eve rewrites LinkedIn. KingdomKode ends (23 Feb). Edify starts. Venture studio becomes the operating model (31 Mar). Gemini 3, Opus 4.5, Claude Cowork
May to Jul 2026 PRFAQ held (Jun). DISA pricing agreement 31 Jul. RegGenome ends content deal 6 Jul. Release Owner’s Gate written 1 Jun; SCF AAT-33 8 Jul. Phil and Steven leave (Jul). Operator selection named as bottleneck (May). CMMC Phase 2 suspended 13 Jul
Aug to Oct 2026 Strike Graph A-1 closed 21 Aug. Mapping engine shipped 30 Sep. MCP beta 19 Sep. Embed landed 15 Oct. QBatch off; agents code. Gate forced on merges 25 Sep. Chief of Staff and ten departments, Oct. Claude 5 family, Fable 5.1. GAO decision 21 Sep.

Source notes:

Old p.4 timeline (R7-01) with the Chief of Staff marker corrected to October per pp.29 and 32 (the original p.4 placed it at August). Studio structure and strategy kernel from p.23: Vertex Holdings holds positions; MoxyWolf LLC is the operating company; diagnosis / guiding policies / actions per R4-01.