R8-02 Four bets (1 of 2): assumptions and verdicts
Moved from deck appendix page A02 on 21 Oct 2026 (deck v2.2 → v2.3). Content as it stood on the slide; the source notes follow each part.
Part 1
| Bet | Riskiest assumption | Test and evidence | Verdict, date | Effect on the next dollar and hour |
|---|---|---|---|---|
| Assured (Jody’s book, live May 2025) | The book is a funnel to classes and coaching | Readers bought and praised it; 24 testimonials. Nobody enrolled in a class. Income is the author’s. | Redeveloped, Mar 2026 | Site rebuilt in-house; classes dropped; book remonetised for Jody. No MoxyWolf hours past the rebuild. |
| DeepFeedback.ai (from Looplytic, May 2025) | Founders will pay for AI customer research | Demand real, trust cliff at signup. About $35K lifetime revenue in the JV account; never enough to carry a team. | Partners out 13 Jan; wound down 20 Feb 2026 | Partners’ time out. Founder’s time to STIGViewer. |
| PRFAQ (prfaq.dev, Nov 2025) | A sales motion exists without consulting | Built in two 8-hour sprints (Jun 2026). Pull came only through consulting. The method ran STIGViewer’s own launch. | Held, Jun 2026 | No further build. Runs as an option; the method stays in use. |
| STIGViewer / OpenControls (handed over Sep 2025) | The user, the buyer and the seller are one person | They are three. Practitioner free, compliance lead signs, partner resells. 2 paying through Stripe, 1 invoiced. | Anchor, Sep 2025 on | The mapping engine, the partner bench, the pricing. Every next dollar and hour. |
Source notes:
Old pp.6 and 17. How the fourth bet arrived: Helmut Neher ran STIGViewer for UCF; after Dorian left, DoD and DISA instructed the handover; a GSA team took it first; Michael took the helm 26 Sep 2025 (R1-02, R1-07, R1-11). Failure reasons unchanged from the original.
Part 2
| When | The bets | The founder and team | The world |
|---|---|---|---|
| Apr to Jul 2025 | Classes start 26 Apr. Assured live May. DeepFeedback built from Looplytic. | Meets Phil in class. KingdomKode starts. Steven joins (Aug). | Claude 4, Claude Code GA |
| Oct 2025 to Jan 2026 | STIGViewer handover (26 Sep); new site Nov. PRFAQ designed with Mike Boysen. RegGenome JV: pass (10 Dec). | Google AI Agents Live + Labs, LA (15 Oct). Eric: venture studio. First plugin. | GPT-5. Marketplace public (3 Jan). |
| Jan to Apr 2026 | DeepFeedback partners out 13 Jan; wound down 20 Feb. Assured redeveloped Mar. | Eve rewrites LinkedIn. KingdomKode ends (23 Feb). Edify starts. Venture studio becomes the operating model (31 Mar). | Gemini 3, Opus 4.5, Claude Cowork |
| May to Jul 2026 | PRFAQ held (Jun). DISA pricing agreement 31 Jul. RegGenome ends content deal 6 Jul. | Release Owner’s Gate written 1 Jun; SCF AAT-33 8 Jul. Phil and Steven leave (Jul). Operator selection named as bottleneck (May). | CMMC Phase 2 suspended 13 Jul |
| Aug to Oct 2026 | Strike Graph A-1 closed 21 Aug. Mapping engine shipped 30 Sep. MCP beta 19 Sep. Embed landed 15 Oct. | QBatch off; agents code. Gate forced on merges 25 Sep. Chief of Staff and ten departments, Oct. | Claude 5 family, Fable 5.1. GAO decision 21 Sep. |
Source notes:
Old p.4 timeline (R7-01) with the Chief of Staff marker corrected to October per pp.29 and 32 (the original p.4 placed it at August). Studio structure and strategy kernel from p.23: Vertex Holdings holds positions; MoxyWolf LLC is the operating company; diagnosis / guiding policies / actions per R4-01.